Dear Sir or Madam,
Bryant Hargreaves Subsea Division are currently are recruiting for a LOLER REPRESENTATIVE / RIGGING SUPERVISOR for our clients platform. (Walk to work via vessel set-up) as per the spec below:
LOCATION : UK / North sea platform, vessel campaign activities.
DETAILS : Initial trip starting circa ASAP (within next 2 weeks) on a 2/2 rotation from May through to September 2014
__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
MAIN RESPONSIBILITIES :
Manage all aspects of rigging operations specific to the vessel campaign activities for the platform.
Participate in Company safety awareness & initiative schemes
MAIN ACTIVITIES :
Ensure compliance of activities with Lifting Operations and Lifting Equipment Regulations 1998 ( LOLER)
Ensure implementation of lifting activities meets Company Lifting Equipment Control and Operation Procedures (LECOP) requirements
Review prior to issue and approve contractor lifting plans & risk assessments
Ensure contractor carries out operations in a controlled and safe manner, in compliance with lift plans & risk assessments
Carry out rigging loft and equipment checks to requirements of LECOP
Audit lifting operations on site to ensure compliance with LECOP and safe lifting operations
Responsible for assessing effectiveness of working practices and systems with a view to continual improvement of performance
Platform Topsides hook-up and commissioning activities, Brownfield construction / Hook-up and commissioning, fabric maintenance as time allows.
Encourage proactive and open approach to learning & sharing knowledge.
OTHER REQUIREMENTS :
SVQ Level 3 Moving Loads or Erecting capital steel plant.
ECITB Appointed Person Moving Loads Stage 1
OPITO Stage 3 Banksman / Slinger & OPITO Stage 3 Rigger Assessment
LOLER Lift Planning
LOLER Risk Assessment
Rigging Equipment Inspection
Computer Literate, Word, Excel, Power Point.
Manual Handling
Must have direct experience using ISSOW software.
Good communication skills required and the ability to interact with personnel at all levels.
Ability to use sound rational judgement in decision making
Good understanding of plant operation, maintenance and construction activities on an oil & gas facility is required
Strong prioritisation, time management & organisational skills
__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Application CV & certification pack by e-mail to subsea@bryantgroup.co.uk
Many thanks, Phil
Philip Hargreaves FIRP
Director
Bryant Hargreaves Subsea Division
Bryant House
440 Union Street
Aberdeen
AB10 1TR
Bryant Hargreaves Subsea Division are currently are recruiting for a LOLER REPRESENTATIVE / RIGGING SUPERVISOR for our clients platform. (Walk to work via vessel set-up) as per the spec below:
LOCATION : UK / North sea platform, vessel campaign activities.
DETAILS : Initial trip starting circa ASAP (within next 2 weeks) on a 2/2 rotation from May through to September 2014
__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
MAIN RESPONSIBILITIES :
Manage all aspects of rigging operations specific to the vessel campaign activities for the platform.
Participate in Company safety awareness & initiative schemes
MAIN ACTIVITIES :
Ensure compliance of activities with Lifting Operations and Lifting Equipment Regulations 1998 ( LOLER)
Ensure implementation of lifting activities meets Company Lifting Equipment Control and Operation Procedures (LECOP) requirements
Review prior to issue and approve contractor lifting plans & risk assessments
Ensure contractor carries out operations in a controlled and safe manner, in compliance with lift plans & risk assessments
Carry out rigging loft and equipment checks to requirements of LECOP
Audit lifting operations on site to ensure compliance with LECOP and safe lifting operations
Responsible for assessing effectiveness of working practices and systems with a view to continual improvement of performance
Platform Topsides hook-up and commissioning activities, Brownfield construction / Hook-up and commissioning, fabric maintenance as time allows.
Encourage proactive and open approach to learning & sharing knowledge.
OTHER REQUIREMENTS :
SVQ Level 3 Moving Loads or Erecting capital steel plant.
ECITB Appointed Person Moving Loads Stage 1
OPITO Stage 3 Banksman / Slinger & OPITO Stage 3 Rigger Assessment
LOLER Lift Planning
LOLER Risk Assessment
Rigging Equipment Inspection
Computer Literate, Word, Excel, Power Point.
Manual Handling
Must have direct experience using ISSOW software.
Good communication skills required and the ability to interact with personnel at all levels.
Ability to use sound rational judgement in decision making
Good understanding of plant operation, maintenance and construction activities on an oil & gas facility is required
Strong prioritisation, time management & organisational skills
__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Application CV & certification pack by e-mail to subsea@bryantgroup.co.uk
Many thanks, Phil
Philip Hargreaves FIRP
Director
Bryant Hargreaves Subsea Division
Bryant House
440 Union Street
Aberdeen
AB10 1TR